Compute capacity, staffing trade-offs, and break-even
Capital OneData Scientist · HR ScreenLast updated
This question tests the ability to model operational costs, evaluate staffing trade-offs between overtime and contracting, and perform break-even analysis under varying volume assumptions.
The Problem
You are analyzing the capacity of a customer support team that handles an average of 10,000 inquiries per week. Each inquiry takes 30 minutes to resolve. Currently, the team has 125 full-time employees (FTEs) who work 40 hours per week.
Constraints & Costs:
- An FTE costs $2,000 per week (fully burdened).
- Overtime pay is 1.5x the hourly rate of an FTE. You must calculate the hourly rate based on a 40-hour work week.
- Alternatively, you can hire contractors at a flat rate of $60 per hour, but they require 5 hours of training (unpaid to them, but requires an FTE supervisor) per 40 hours of work.
Your Task:
- Determine the current capacity utilization rate of the team.
- If inquiry volume increases by 20% next month, calculate the cost difference between meeting the demand via mandatory overtime versus hiring contractors.
- Identify the "break-even" volume increase (percentage) where the cost of hiring a new permanent FTE becomes cheaper than continuing with contractor labor.
Assumptions:
- FTEs operate at 90% efficiency (10% of time is spent on non-inquiry tasks).
- Assume a 50-week working year.
- Training requires 5 hours of an FTE's time per contractor hired.
Hints
Hint 1
First, calculate the hourly rate of an FTE and compare it to the total cost of contractor labor including the supervisor training overhead.
Hint 2
Calculate the total man-hours required for the 20% increase in volume and convert those into FTE equivalents vs. overtime hours.
Hint 3
For the break-even analysis, set up an equation where Cost(FTE) = Cost(Contractors) based on the variable volume increase x.
Follow-up questions
- How would your recommendation change if the inquiry volume were highly seasonal versus experiencing steady, long-term growth?
- If contractor efficiency is only 75% compared to the 90% efficiency of FTEs, how does this impact your break-even point?
- What qualitative factors—beyond just labor cost—should we consider when choosing between overtime and contractors?
Solution walkthrough is for members
Get the full walkthrough with reference code and complexity analysis, plus Kitty Coach at 300 messages a day. Hints, the code runner and community answers stay free.